Sunday, January 22, 2012

The Rebuild Begins...


Work began on disassembling number 19 straight away. The smokebox front, headlight, and dynamo have already been removed even though there was still enough heat in the boiler to blow the whistle a final time before it too was taken off and stored away.

The interior of the smokebox showing the dry pipes, petticoat, blast pipe, and all two hundred and thirty one boiler tubes.

The smokebox front and door. The numberplate and smaller hardware have already been removed. 


No comments:

Post a Comment